Damage to Highway 151 in Archuleta County. CDOT photo.
The Federal Highway Administration has approved $9.1 million in additional quick release Emergency Relief funds to help repair highways and eligible local roads damaged by two back-to-back storms in Southwest Colorado. The funding comes as the Colorado Department of Transportation updated its estimate of flood damage to $156 million, up from an initial estimate of $65 million after the first storm.
This second estimate accounts for the second consecutive weekend of flooding that impacted southwest Colorado.
Funding through FHWA is separate from funding requested through the Governor’s second Presidential Major Disaster Declaration that was submitted to the Federal Emergency Management Agency last Friday.
The $9.1 million is in addition to the $6.5 million FHWA approved earlier this fall, bringing the total quick release funding to $15.6 million. It includes $600,000 for county roads, which is 10% of an estimated $6 million in damage to local roads. CDOT requested the funds on behalf of the counties. CDOT will be working with counties to identify damages that will be eligible for this federal program as damage assessments continue to be conducted.
“Southwest Colorado has been dealing with major impacts, not only with their roads but their everyday lives, and we’re grateful to the Federal Highway Administration for moving so quickly on this second round of immediate funding,” said CDOT Executive Director Shoshana Lew. “These dollars let our crews and contractors keep working on emergency repairs without delay, and have already been critical in achieving key milestones like getting Wolf Creek Pass and CO 151 open before Thanksgiving. We truly appreciate the quick attention from FHWA and the continued support from Sen. Bennet, Sen. Hickenlooper and Congressman Hurd.”
CDOT maintenance crews, engineers and contractors have been working around the clock to reopen critical routes and prioritize extensive repair work on several highways including US 160 Wolf Creek Pass between Pagosa Springs and South Fork, US 160 at the Piedra River bridge between Durango and Pagosa Springs, and CO 151 between Ignacio and Pagosa Springs.
The quick release funds help CDOT to achieve reopening highways such as Colorado Highway 151 south of Pagosa Springs, which will reopen on Tuesday before the Thanksgiving holiday, and US 160 Wolf Creek Pass. The restored highways will eliminate hours-long detours, particularly for Pagosa Springs residents who have been isolated by the multiple road closures.
The $156 million figure is an estimate, CDOT expects it to change as inspections and assessments continue. The $156 million total request to the federal government will be augmented by $20 million in state emergency contingency funds authorized by the Colorado Transportation Commission. CDOT will request additional federal Emergency Relief funding as damage is verified.
For additional information about this event, visit the project website.
Know Before You Go
Travelers are urged to “know before you go.” Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road. CDOT resources include:
Road conditions and travel information: COtrip.org
Download the COtrip Planner app: bit.ly/COtripapp
Sign up for project or travel alerts: bit.ly/COnewsalerts
Download the COtrip App
The new free COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!
The Pagosa Daily Post welcomes submissions, photos, letters and videos from people who love, and care about, Pagosa Springs, Colorado. More information available at 970-903-2673 or pagosadailypost@gmail.com

