CDOT to Perform Highway Repairs East of Bayfield

Beginning January 2, the Colorado Department of Transportation will perform month-long erosion control operations on a four mile segment of US Highway 160, just east of Bayfield.

Operations will take place Monday and Friday between Mile Points 105 and 109. Motorists should plan for 10-15 minute delays, flaggers and one-lane alternating traffic between 9am and 3pm each day.

Crews will work swiftly to stabilize the shoulder of the highway however, work is weather permitting.

Traffic Impacts
Daytime work hours range from 9am to 3pm, January 2 – February 2, 2024.
Motorists can expect full stops and up to 15-minute delays and should allow for extra travel time.
Vehicles will be guided by signs and flagging personnel.
A speed reduction of 40 mph will be enforced through the work zones.

Know Before You Go
Travelers are urged to “know before you go.” Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road.

CDOT resources include Road conditions and travel information at COtrip.org

Download the COtrip App
The free COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public.

The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms.

Post Contributor

The Pagosa Daily Post welcomes submissions, photos, letters and videos from people who love Pagosa Springs, Colorado. Call 970-903-2673 or email pagosadailypost@gmail.com