CDOT has contacted us with the following:
A portion of Main Street will be closed in both directions for a maximum of 10 minutes between the Courthouse and the 1st Street Bridge at approximately 6pm this evening, Monday April 20.
The contractor will be conducting a pavement smoothness assessment with mobile equipment traveling westbound in the eastbound lane during this 10 minuted period.
The contractor will have traffic control flaggers and/or WW Clyde work trucks blocking intersections for this 10 minute period.
This also dictates that they will run the red light at Hot Springs Blvd while traffic is blocked.
